This shows you the differences between two versions of the page.
| Both sides previous revisionPrevious revision | |||
| en:safeav:avt:infrastruct [2025/09/18 14:20] – ToDo checked: raivo.sell | en:safeav:avt:infrastruct [2026/04/24 09:48] (current) – raivo.sell | ||
|---|---|---|---|
| Line 1: | Line 1: | ||
| ====== Testing Infrastructure ====== | ====== Testing Infrastructure ====== | ||
| - | {{: | ||
| - | |||
| - | <todo @raivo.sell # | ||
| As discussed earlier, generic V&V process consists of testing the product under test within the ODD. This is generally done with a number of techniques. The central paradigm is to generate a test, execute the test, and have a clear criteria for correctness. | As discussed earlier, generic V&V process consists of testing the product under test within the ODD. This is generally done with a number of techniques. The central paradigm is to generate a test, execute the test, and have a clear criteria for correctness. | ||